5/9/10: Mothers’ Day Workday-Beds Finished

We finished the beds today and made serious headway on the fence! Thanks to a local alpaca farmer, we received a surprise delivery of free alpaca manure to mix into the beds.

The 10 beds were constructed using the “lasagna” method of raised bed building. A first layer of cardboard was laid down straight onto the grass follow by a layer of shredded paper. On top of the paper, pre-consumer food scraps from Oberlin College dining halls were added. Next, a healthy layer of leaf mulch covered the food waste followed by 3-4 inches of top soil. The alpaca manure was hand-tilled into the soil mixture on top of the beds.

This slideshow requires JavaScript.

O yeah, and the ice cream man came; what a perfect day.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s